We installed two different flooring systems for Bark Avenue’s new location in Ankeny, IA. The lobby, grooming area, and facility hallways, we polished the concrete to a Class B Level 3 polish with Retroplate 99 hardener and Retroguard sealer. The training rooms, suites, and daycare rooms received a 3-coat resinous flooring system that consisted of epoxy body coat with a broadcast of decorative vinyl chips to refusal, epoxy grout coat and high-performance UV & stain resistant urethane top coat.